GlobalNews411

Comprehensive reporting, aggregated for speed.

allentown

Inspectors find 85 failures in Lincoln Memorial Reflecting Pool liner

An inspection commissioned by the contractor found at least 85 failures in the new blue liner installed this summer.

Published Oct 14, 2026, 1:30 PM EDT | LehighValleyLive

A new report is raising more questions about what went wrong during the renovation of the Lincoln Memorial Reflecting Pool in Washington, according to a story published in The Washington Post. The blue liner installed this summer failed in at least 85 places, according to an inspection commissioned by the contractor, The Independent reported.